Friday, November 20, 2015

Kitchen progress.

The windows and door came today. I tore out the old crappy back door. The hole must be larger for the double french doors. I had to support the roof while installing a new header over the french doors. 


Panorama photos are great but skew things so much it is difficult to tell what is going on. I am standing where the fridge will go and spun from the back door toward the makeshift kitchen behind the plastic on the right. Tabitha and I installed the two windows on the exterior wall of the dining area. 


Tomorrow I'll install the french doors and probably tear up more of the floor.
Post a Comment
Related Posts Plugin for WordPress, Blogger...