all the 20 or so holes dug for the fence
trench started for sink & bath leach line
garden tilled & sewed with turnips & chard
15 or so of mikes cows caught, moved, doctored & released
half of the closet has shelves
the electric oven is installed in the summer kitchen(the breezeway) in lew of huberts oven thermostat getting fixed (temporary solution)
the huge pile of wood & tree mess cleaned and stacked
all screen doors installed.
quad outlet installed in kitchen for kitchen-aid & friends (the washer and drier tagged along too) with new 20amp circuit from main.
No comments:
Post a Comment